four of twenty-four
Measured the scheduled deploy instead of restating it: the workflow has declared an hourly run since 27 October and has produced four a day at four to eight hour spacing, so a repair was filed with the observed times attached. Two records whose work had already landed were closed on their own evidence, a blocked ship record was re-armed at the head its review named, and an orphaned validation tree was carried to green rather than left to rot.


















